1.
Route each network cable into the charging station through the chosen entry point.
Note:
Use SFTP Category 6 network cable for the RS485 connection.
2.
Cut and strip each network cable to the required length.
• Use the green/green-white twisted pair of wires for the RS485 Hub-Satellite connections.
• Use the blue/blue-white twisted pair of wires for the RS485 smart charging connections.
3.
Strip the network cable wire ends.
Install wire end sleeves with a ferrule length of 12-15 mm (0.47-0.60 in) and apply a square crimp
for optimal fit into the terminal blocks.
4.
Feed each network cable through the small cable glands into the installer box.
5.
Push the ferrules on the network cable wires fully into the terminal blocks.
6.
Terminate the RS485 Hub-Satellite loop at the last Satellite station in the loop with the 120 Ω
resistor (supplied with the small components).
Note:
The 120 Ω resistor is not required when only a Hub is installed.
7.
Pull on each wire to make sure it is correctly connected.
The indicators on the terminal blocks must be in the locked position.
The network cables are connected.
4.4.4. Close covers
See the corresponding illustrations in manual B.
1.
Install the installer box cover then tighten the six screws.
2.
Install the installer box frame using four Torx screws.
3.
Close the side covers as follows:
a. Slide the side panels closed.
b. Install and tighten the eight thumbnuts.
c. Tighten the four Torx screws.
4. Installation instructions
EN
33
Summary of Contents for Iqon
Page 1: ...Installation and commissioning manual Part A EVBox Iqon ...
Page 2: ......
Page 3: ...EVBox Iqon Installation and commissioning manual Part A ...
Page 4: ......
Page 18: ...3 4 Dimensions EN 3 Product features 14 ...
Page 23: ...Back to back installation Example dual bay location 4 Installation instructions EN 19 ...
Page 52: ...EN ...
Page 53: ......