
4.1.6. Phase rotation
To avoid overloading the first phase with one-phase electric vehicles, we recommend rotating the
phases as shown below.
Note:
If phase rotation is used you must inform EVBox at
so the support
team can update the backend system data.
Single 3-phase 400 V AC 64 A power cable
Two 3-phase 400 V AC 32 A power cables
4.1.7. Hub-Satellite installations
A Hub-Satellite charging station installation can consist of up to 9 Iqon Satellite stations connected to
the Iqon Hub station. In any installation there must be one Hub station, and all Satellite stations
connect to that Hub station. A Hub-Satellite installation uses two separate RS485 serial data
connections for the following data communication:
• Smart Charging using the MAX protocol - from the external power supply cabinet to the Hub.
EN
4. Installation instructions
22
Summary of Contents for Iqon
Page 1: ...Installation and commissioning manual Part A EVBox Iqon ...
Page 2: ......
Page 3: ...EVBox Iqon Installation and commissioning manual Part A ...
Page 4: ......
Page 18: ...3 4 Dimensions EN 3 Product features 14 ...
Page 23: ...Back to back installation Example dual bay location 4 Installation instructions EN 19 ...
Page 52: ...EN ...
Page 53: ......