25
Clearance Requirements from Vent Terminations to Building Openings
All clearance requirements are in accordance with ANSI Z21.10.3 and the National Fuel Gas Code,
ANSI Z223.1 and in Canada, in accordance with NSCNGPIC.
Vent Clearances When Heater is Installed Indoors
□
Vent Clearances When Heater is Installed Outdoors With a Vent Cap
□
Maintain the following clearances to any opening in any building:
●
4' below, 4' horizontally from, or 1' above any door, operable window, or gravity air inlet into any building.
3' above any forced air inlet within 10'.
Maintain the following clearances to any opening in any building:
●
From the unit: 4' below, 4' horizontally from, or 1' above any door, operable window, or gravity air inlet into any
building.
3' above any forced air inlet within 10'.
For outdoor installation, we recommend using the outdoor venting cap for rain protection.
For Installations in Canada, clearances are as follows: To windows, doors, & gravity air inlets: 36".
To forced air inlets: 6'. These clearance requirements hold true for all of the above situations: Indoor, Outdoor w/vent cap.
WARNING
!
!
●
●
●
Outdoor Venting Cap
Summary of Contents for GU145 (S)
Page 5: ...5 Dimensions GU145 S 508 11 12 21 22 1145 S GU195 S M 508 11 12 21 22 1195 S M ...
Page 6: ...6 Parts Diagram for Model GU145 S 508 11 12 21 22 1145 S GU195 S M 508 11 12 21 22 1195 S M ...
Page 7: ...7 Parts Diagram for Model GU145 S 508 11 12 21 22 1145 S ...
Page 56: ...56 Wiring and Connection Diagram Wiring Diagram MODEL GU195 M 508 11 12 21 22 1195 M ...