Horizontal Termination
Side Wall (Direct Vent)
Side Wall (Concentric Vent)
Side Wall (Power Vent)
□
□
□
Below diagrams are examples of vertical terminations.
Once the vent terminal location has been determined, make a hole through the exterior wall to accommodate
the vent pipe. Vent pipe must only exit exterior wall horizontally.
Place the 1/2" metal mesh screen inside the terminal
tting and connect it as shown to the vent pipe on the
exterior of the building.
Seal any opening around the vent pipe or
ttings with mortar or silicone caulk "as shown" above.
Complete the rest of the vent pipe installation to the water heater's vent connector
tting on the blower outlet.
If necessary support horizontal run as previously mentioned.
□
□
□
□
WARNING
!
!
The Grand Hall approved concentric kit is a unique
pipe-in-pipe venting system designed for termination.
Do not try to replicate or make your own. For more
information, please refer to
Concentric Vent Kit
section in the Operation manual.
WARNING
!
!
An open tee is optional but recommended to
use as a termination to alleviate and prevent
back pressure in the venting system.
For optimal results the open tee should be
positioned vertically.
Summary of Contents for GU145 (S)
Page 5: ...5 Dimensions GU145 S 508 11 12 21 22 1145 S GU195 S M 508 11 12 21 22 1195 S M ...
Page 6: ...6 Parts Diagram for Model GU145 S 508 11 12 21 22 1145 S GU195 S M 508 11 12 21 22 1195 S M ...
Page 7: ...7 Parts Diagram for Model GU145 S 508 11 12 21 22 1145 S ...
Page 56: ...56 Wiring and Connection Diagram Wiring Diagram MODEL GU195 M 508 11 12 21 22 1195 M ...