22
Installation
b. Connect AC power to the AC terminal block following the
label chart inside the ATC:
Step 3:
If your installation includes Remote Stations, continue the single
daisy chain run for the Data and DC Power to the next station.
Step 4:
Using a small screwdriver, set the two rotary switches found on
the ATC’s Contact Closure station to the fixture address
assigned to the ATC. This address information should come
from the same source as the luminaire addresses.
Step 5:
Replace the ATC front panel.
Summary of Contents for IRIDEON
Page 10: ...6 Introduction This page intentionally blank...
Page 44: ...40 System Test This page intentionally blank...
Page 50: ...46 Troubleshooting This page intentionally blank...
Page 60: ...56 Maintenance This page intentionally blank...
Page 64: ...60 Software Hardware Components This page intentionally blank...
Page 70: ...66 Astronomical Time Clock installation instructions This page intentionally blank...
Page 83: ...Irideon Control Installation and User Manual 79 This page intentionally blank...