ES5340.2 Electric Drive Simulation Board - User’s Guide
68
Configuring the Hardware in LABCAR-RTC
ETAS
2. In the list, select the "ES5340-Dig-In-HW" item and
click
OK
.
The item is added.
Assigning Inverter Gates to Measurement Channels
For the ES5340.2-M, we assume that six gate signals are present (two for each
phase).
1. Assign the gate signals to the desired measurement
channels.
When measuring the gate control, for each mea-
surement channel, one upper and one lower volt-
age level can be specified, below (above) which the
signal is identified as "low" ("high").
Summary of Contents for ES5340.2
Page 1: ...ES5340 2 Electric Drive Simulation Board User s Guide...
Page 6: ...ES5340 2 Electric Drive Simulation Board User s Guide 6 Contents ETAS...
Page 22: ...ES5340 2 Electric Drive Simulation Board User s Guide 22 Introduction ETAS...
Page 116: ...ES5340 2 Electric Drive Simulation Board User s Guide 116 ETAS Contact Addresses ETAS...
Page 118: ...ES5340 2 Electric Drive Simulation Board User s Guide 118 Figures ETAS...