Connection and assembly
Doc. no. MA007828_00
15 / 34
EN
4.3.2 Surface mounting
For surface mounting, you will need the ESYLUX surface-mounted box IP
20/IP 44 (item number EM10055164).
Connect the detector according to the wiring diagram (see section
“4.2 Connection”).
Screw the detector into the surface-mounted box.
Then attach the frame:
Screw the detector cover onto the frame on the detector.
4.4 Warm-up phase
The warm-up phase starts every time the power is switched on. During this
phase, the detector either loads the factory settings (program 1) or the last
used program (program 1-5). The detector is ready for use after approx. 30
seconds.
Detector behaviour when started using the factory settings:
• Channel 1 is closed, a connected luminaire is switched on.
• Model Model PD-C 180i Touch plus: Channel 2 is open.
• LED signals: Multiple sequences of dark blue and red. Ends with light
blue.
Frame
mounting