E-S 500 / 502 Classic Series Instruction Manual
Control Box & Running Wires
3.3
Control Box Mounting:
• The control box can be mounted on a post or
fence line.
• If you have a dual operator set up, make sure it is lo-
cated within 45’ of the slave motor.
• Allow at least 3 feet of clearance off the ground.
Wiring:
• Cut to fit the proper water tight connector ring for
your wire(s).
• Fill in any visible gaps with caulk.
Dual Operation Junction Box:
You will need the following items for this installation:
• Second Junction Box
• Screws
• PVC Conduit
1) Set aside the junction box cover and screws.
2) Drill two holes in the bottom of the junction box large
enough to fit the cables.
3) Mount the junction box within 5 feet of slave
operator.
The junction box can be mounted on a post or a fence
line. Allow at least 3 feet of clearance off the ground.
4) Insert operator cable and extension cable into the
holes in the bottom of the junction box, and seal with
caulk.
*You may also use a watertight connector and con-
nector nut to secure the cables. Found at your local
hardware store.
6) Insert wires from extension cable and operator cable
into the terminal block connector as seen to the right.
7) The terminal block may be kept loose or
fastened inside of the junction box.
8) Install and secure cover.
See next page for instructions on running wire
under the driveway.
TIP:
If junction box is located in a
high moisture area, apply petrole-
um jelly on to the terminal block to
protect from moisture.
Mounting hole
Mounting hole
Seal area accordingly
Summary of Contents for E-S 500
Page 5: ......
Page 10: ...E S 500 502 Classic Series Instruction Manual SECTION 2 Installation of Mounting Brackets ...
Page 11: ......
Page 26: ......
Page 36: ...E S 500 502 Classic Series Instruction Manual SECTION 4 Start Up and Operation ...
Page 37: ......
Page 45: ......