E-S 500 / 502 Classic Series Instruction Manual
Installation of Operator — Push-to-Open
2.12
Continue on next page.
Before permanently attaching any brackets, be sure to test arm motion
and clearance.
7) Place the upper “L” shaped bracket
and the boomerang bracket on the lower
“L” shaped bracket.
Position the brackets
in the setback that is being used.
8) With the 3 brackets clamped together,
mark then drill the upper “L” shaped brack-
et in place and attach it using 3/8” car-
riage bolts. [
See Fig. 5
]
9) Drill through the center hole of the “L”
shaped set to penetrate the boomerang
bracket.
Double check the setback on the
boomerang bracket.
10) Drill the set hole through all 3 brackets
using a 5/16” drill bit in an area behind the
first hole. Secure the hole with a 5/16” bolt
and the provided nuts and lock washers.
[
See Fig. 6
]
Fig 5
Fig 6
Summary of Contents for E-S 500
Page 5: ......
Page 10: ...E S 500 502 Classic Series Instruction Manual SECTION 2 Installation of Mounting Brackets ...
Page 11: ......
Page 26: ......
Page 36: ...E S 500 502 Classic Series Instruction Manual SECTION 4 Start Up and Operation ...
Page 37: ......
Page 45: ......