background image

C

ERMET

A

Z

IE

N

D A

 C E R TIF

IC

A

T

A

UNI EN ISO 9001-085

400

400

Summary of Contents for 400 CBAC lungo

Page 1: ...C ERME T A Z I E N D A C E R TIF I C A T A UNI EN ISO 9001 085 400 400...

Page 2: ...al d a la presente publicaci n todas las modificaciones que considere oportunas para el perfeccionamiento t cnico o para cualquier otro tipo de exigencia de car cter constructivo o comercial FAAC S p...

Page 3: ...e 89 392 EEC and subsequent amendments 91 368 EEC 93 44 EEC and 93 68 EEC complieswiththeessentialsafetyrequirementsinthefollowingEECDirectives 73 23 EEC and subsequent amendment 93 68 EEC 89 336 EEC...

Page 4: ...on the supply line to the automation with a contact opening distance of 3 mm or more We recommend the use of a 6A thermal magnetic circuit breaker with multi pole switching 13 Ensure that a residual...

Page 5: ...n IP 55 Max thrust traction force daN 620 620 620 775 465 465 465 Rod stroke mm 260 260 260 260 260 380 380 Rod speed cm s 1 1 1 0 75 1 5 1 5 1 5 Operator weight Kg 8 6 8 6 8 6 8 6 8 6 10 10 Duty cycl...

Page 6: ...e nut provided 4 Release the operator see paragraph 5 5 Extend the rod to the end of its stroke and then retract it by Table 2 INSTALLATIONDIMENSIONS about 5 mm Fig 5 6 Lock the operator see paragraph...

Page 7: ...sheath 3 Fig 11 13 Repeattheaboveoperationstoinstallthesecondoperator 14 Maketheelectricalconnectionsoftheelectroniccontrolunit followingtheinstructionsprovided 4 START UP Fig 7 Fig 7 Fig 9 4 1 ANTI...

Page 8: ...tion on the side of the operator Fig 12 Carefullycheckoperationoftheoperatorandalltheconnected accessories especiallythesafetydevices Give thecustomerthe Userguide anddemonstratehowtouse the operator...

Page 9: ...tted with one or more electric locks to ensure mechanical locking of the gate leaves The FAAC 400 can automate gate leaves up to 7 m in length depending on the model The operators are controlled by an...

Reviews: