EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
56 (200)
g.
From the left-hand side options select “
Commissioning
” >
“
IBMoE_Reset
”. A warning message will be displayed, select “
Continue
”.
The backplane EPROM parameters will be aligned with the CP card.
h.
In order to allow remote out of band management of the EDA 2530, the Out
of Band Management OBM Ethernet IP Address needs to be altered from
the default of 150.150.150.4 to allow for multiple EDA’s on each site. The
address must be modified in line with the following table.
DLE ID
IP Address
DLE ID
IP Address
DLE ID
IP Address
0101 150.150.150.4
0201 150.150.150.8 0301 150.150.150.12
0102 150.150.150.5
0202 150.150.150.9 0302 150.150.150.13
0103 150.150.150.6
0203 150.150.150.10 0303 150.150.150.14
0104 150.150.150.7
0204 150.150.150.11 0304 150.150.150.15
0105 150.150.150.16
0205 150.150.150.17 0305 150.150.150.18
i.
If the EDA 2530 default Out Band Management OBM IP address has to be
changed in line with the Network Plan, then from the left-hand side options
select “
Commissioning
” > “
extEthIP
”.