
EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
124 (200)
7.17.5
Step 4: Configure ITAM For Double Play
a.
From the LCT main screen select the path;-
Configuration
>
Connection Modules
b.
On the “Connection Modules configuration” screen wait for the information
to be read into the table.
c.
Highlight the 1
st
Connection Module for the combined ADSL/POTS slot to
be configured.
d.
Click on the
View/Modify Selected Connection Module
button.
e.
Set the Connection Module Type to
cm-adslpotsx64-TAM-PPB
for
Connection Module type 02HAT00282AAQ, if not already set.