EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
133 (200)
l.
Click on the “
Apply to selection
” button at the bottom of the window to
change the profiles of all 64 ports. This may take up to 1 min.
m.
Select the “
Status/Maintenance
” tab, ensure all ports are still selected ie
they are all red. Now click on “
Enable all selected lines
” button, after
about 1 min all ports should turn green.
n.
Verify that on any four randomly selected ports, the “
Line Oper Status
”
field has changed to “
Enabled
”.