EPSON Stylus Pro 3800/3800C/3850
Revision A
DISASSEMBLY & ASSEMBLY
Disassembly/Assembly Procedure (Group 1)
166
5.
Lift up the left side of the main frame, and remove the SPUR GEAR, 31.5 and the
COMPRESSION, SPRING, 2.25 from the main frame.
See Figure 4-100.
6.
Remove the TIMING BELT, PF from the pinion gear and the COMBINATION
GEAR, PF, DRIVE of the MOTOR ASSY., PF.
See Figure 4-101.
Figure 4-100. Removing the SUPUR GEAR, 31.5 (2)
Figure 4-101. Removing the TIMING BELT, PF
A D J U S T M E N T
R E Q U I R E D
Whenever the TIMING BELT, PF is replaced,
the corresponding adjustments must be carried out.
See Chapter 5
"ADJUSTMENT" (p190)
.
Left side
COMPRESSION,
SPRING, 2.25
SPUR GEAR, 31.5
pinion gear
(MOTOR ASSY., PF)
TIMING BELT, PF
COMBINATION GEAR, PF, DRIVE
Summary of Contents for 3800 - Stylus Pro Color Inkjet Printer
Page 1: ...EPSONStylusPro3800 3800C 3850 Large Format Color Inkjet Printer S SERVICE MANUAL SEIJ06007 ...
Page 5: ...Revision Status Revision Date of Issue Description A November 30 2006 First release ...
Page 9: ...C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 35: ...C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 61: ...C H A P T E R 3 TROUBLESHOOTING ...
Page 85: ...C H A P T E R 4 DISASSEMBLY ASSEMBLY ...
Page 190: ...C H A P T E R 5 ADJUSTMENT ...
Page 250: ...C H A P T E R 6 MAINTENANCE ...
Page 262: ...C H A P T E R 7 APPENDIX ...
Page 279: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......