SteamAttrac - Installation and Operating Instructions
49
Mounting
2
Connect the cable to the connection terminal.
Connecting the mains cable and control panel
3 kW generator: Mains connection to L1, N and PE
4/6 kW generator: Mains connection to L1, L2, L3, N and PE
Control panel Econ S2: WB, S1, ST2 and N. For detailed information,
consult the instructions for the control panel.
3
Close the housing.
See
You can start the unit once the water and steam pipes have been con-
nected.
4
Connect the mains supply line to the power supply.
5
Switch on the system at the control panel.
The water level is checked by a sensor. If the required water level has
been reached, the valve in the water supply line closes automatically.
It takes a few minutes to refill an empty vaporiser tank (flow regulator
in the water inlet valve).
A
Control panel connection
B
Mains connection
WB
S1
N
L2
L1
N
ST2
L3
A
B
PE
A
B