Batch Controller RA33
Wiring
Hauser
15
4
Wiring
4.1
Connection requirements
#
Warning!
Note that the entire electrical connection must be carried out only while the device is de-energized.
"
Caution!
• Before commissioning, ensure that the supply voltage corresponds to the specification on the
nameplate.
• Provide a suitable switch or power-circuit breaker in the building installation. This switch must
be installed close to the device (so that it is easily accessible) and marked as a circuit breaker.
• An overload protection unit (rated current = 10 A) is required for the power cable.
4.2
Quick wiring guide
a0014120
Fig. 15:
Connection diagram of the batch controller
For the connection of the communication interfaces, see the "Communication" section,
Terminal assignment
Terminals
Terminal assignment
Inputs
1
+ RTD power supply
Temperature
(Optionally RTD or current
input)
2
- RTD power supply
5
+ RTD sensor
6
- RTD sensor
52
+ 0/4 to 20 mA input
53
Ground for 0/4 to 20 mA input
54
+ 0/4 to 20 mA input
Density
(Current input)
55
Ground for 0/4 to 20 mA input
10
+ pulse input (voltage or contact)
Flow
(Optionally pulse or current
input)
11
- pulse input (voltage or contact)
50
+ 0/4 to 20mA or current pulse (PFM)
51
Ground for 0/4 to 20 mA input, flow
80
+ digital input 1 (switch input)
• Time synchronization
• Start batch
• Stop batch
• Reset batch
81
- digital input (terminal 1)