![Endress+Hauser Liquistation CSF39 Operating Instructions Manual Download Page 17](http://html1.mh-extra.com/html/endress-hauser/liquistation-csf39/liquistation-csf39_operating-instructions-manual_2407486017.webp)
Liquistation CSF39
Installation
Hauser
17
5.1.3
Mechanical connection
Foundation plan
302 (11.9)
195.4 (7.69)
C
C
D
B
A
A
A
A
137.4 (5.41)
355 (14.0)
61 (2.4)
605 (23.8)
730 (28.7)
786 (30.9)
214 (8.43)
255 (10.0)
311 (12.2)
305 (12.0)
33.6 (1.32)
A0024406
8
Foundation plan
A
Fasteners (4 x M10)
B
Cable inlet
C
Outlet for condensate and overflow > DN 50
D
Sample supply from below > DN 80
--- Dimensions of Liquistation
5.1.4
Connection for suctioning samples
• Maximum suction height:
• Vacuum pump: Standard 6 m (20 ft) Optional 8 m (26 ft)
• Peristaltic pump: standard 8 m (26 ft)
• Maximum hose length: 30 m (98 ft)
• Hose connection diameter
• Vacuum pump: 10 mm (3/8") 13 mm (1/2") , 16 mm (5/8") or 19 mm (3/4") internal
diameter
• Peristaltic pump: internal diameter of 10 mm (3/8")
• Intake speed:
> 0.6 m/s (> 1.9 ft/s) for 10 mm (3/8") ID, as per Ö 5893, US EPA
> 0.5 m/s (> 1.6 ft/s) for ≤ 13 mm (1/2") ID, in accordance with EN 25667, ISO 5667
Note the following when erecting the device:
• Always route the suction line so that it slopes upwards from the sampling point to the
sampler.
• The sampler must be located above the sampling point.
• Avoid siphoning effects in the suction line.
Summary of Contents for Liquistation CSF39
Page 2: ......
Page 188: ...www addresses endress com ...