Installation
Liquistation CSF39
20
Hauser
3. Fit the hose gland in the fixing clamp (item 2) as illustrated.
4. Screw the hose tight from above.
5. Attach the hose adapter supplied to the suction line and screw it onto the hose gland
from below.
6. Insert the dummy plugs supplied.
Connecting the suction line on version with peristaltic pump
1
2
3
4
A0013705
12
Connecting the suction line from the side (as-delivered
state)
1
Small thread adapter nut
2
Hose
3
Thread adapter nut
4
Hose gland
1
A0013706
13
Suction line
1. Unscrew the thread adapter nut (item 3) and the hose fitting (item 4) from the side
panel.
2. Unscrew the small thread adapter nut (item 1) and remove the hose.
3. Connect the suction line from below as illustrated.
4. Insert the dummy plugs supplied.
5.3
Post-installation check
1. Verify that the suction line is securely connected to the device.
2. Visually check that the suction line is installed correctly from the sampling point to
the device.
3. Verify that the rotating arm is correctly engaged.
4. Allow the sampler to rest for a minimum of 12 hours following installation and
before switch-on. Otherwise you may cause damage to the climate control module.
Summary of Contents for Liquistation CSF39
Page 2: ......
Page 188: ...www addresses endress com ...