
EM TEST
UCS 500 Series
Operating Manual
V 5.40
55 / 99
Device
Firmware versions
UCS 500N5
Up to
V 4.40
UCS 500N7
Up to
V 7.42
and
from
V 8.00
to
V 8.02
The built in hardware phase synchronization is between the sync input and PE.
The user must connect the synchronize line with the sync plug.
The synchronization is based on a 3-phase system where neutral is connected to
PE.
As Standard
line L1 is connected to the sync
plug.
The table below shows the correction angels considering the phase in a 3-phase system.
Synchronization: L1 to Sync input
Sync.
Source
Settled phase angel value for coupling:
Coupling
L1-PE
L1-N
L1-PE
L2-N
L2-PE
L3-N
L3-PE
L1-L2
L1-L3
L2-L3
Sync.-
Angel
0°
0°
0°
0°
330°
30°
90°
90°
90°
90°
90°
60°
120°
180°
180°
180°
180°
180°
150°
210°
270°
270°
270°
270°
270°
240°
300°
0°
Example: For setting the coupling L1-L2 with a
180°
phase angle
set the generator phase to
150°