14.2 Verify performance
Use this section to verify SGM performance by flowing the calibration gases through the system to ensure
that the meter is providing an accurate measurement.
Figure 14-1: Typical SGM installation
A. Calibration gas selector three-way valve
B. Process/Calibration gas selector three-way valve
C. Outlet two-way valve
D. Process gas inlet two-way valve
E. Chamber fill valve
F. Purge two-way valve
G. Pressure regulator with gauge
H. Calibration gas 1 inlet
I. Calibration gas 2 inlet
J. Process gas sampling point
K. Tubing work (not shown in diagram)
L. Coalescent filter
M. Coalescent filter drain two-way valve
N. Particle filter
O. Flow meter
P. Transmitter
Q. Reference chamber pressure indicator
R. Relief valve
S. Drain
14.2.1 Verify low calibration gas
Procedure
1. Close the process gas inlet valve (D).
2. Set the process/calibration selector valve (B) to the calibration position.
3. Connect the lower calibration gas to the calibration gas 1 inlet (H).
4. Set the pressure regulator on the lower calibration gas to the appropriate sample pressure for your
installation.
Troubleshooting
Configuration and Use Manual
March 2021
MMI-20020954
120
Micro Motion Gas Specific Gravity Meters (SGM)