Lifting and installation conditions
(continued)
Table 4-1:
Conditions
Description
Work area clearances and in-
stallation height restrictions
Refer to
Minimum clearances for installation, operation and maintenance
for
clearances.
Surface considerations
Stable surface.
Soil/floor loadings and prod-
uct/piping support
Follow local procedures that meet the standards for soil/floor
loading and product/piping support.
4.2
Lifting requirements for personnel
WARNING!
EQUIPMENT HANDLING AND OPERATING HAZARD
Wear personal protective equipment appropriate to the situation when working with the
turbine meter. Adhere to all safety standards and best practices for operating the equipment.
Failure to comply may result in death or serious injury.
Best lifting practices
WARNING!
LIFTING HAZARD
The lifting instructions are for installation and removal of the Daniel Liquid Turbine Meter only
and do not address lifting the turbine meter while it is attached or bolted to piping.
Failure to comply with these instructions may result in death, serious injury, or equipment
damage.
4.2.1
Equipment required to lift the turbine meter
WARNING!
CRUSHING HAZARD
During turbine meter installation or removal, always place the unit on a stable platform or
surface that supports its assembled weight.
Failure to comply could allow the turbine meter to roll, resulting in death, serious injury or
equipment damage.
Prepare the turbine meter for use
42
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
Summary of Contents for daniel 1500 series
Page 8: ......
Page 12: ...Plan 2 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 64: ...Prepare the turbine meter for use 54 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 66: ...Install 56 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 72: ...Installation procedure 62 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 74: ...Testing 64 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 75: ...Part III Operate Operate User manual 65 ...
Page 76: ...Operate 66 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 80: ...Maintain 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 101: ...Decommission the turbine meter User manual 91 ...
Page 102: ...Decommission the turbine meter 92 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 103: ...Decommission the turbine meter User manual 93 ...