AXP640 Shelf Installation
AXP640 Installation and Use (6806800M24E
)
98
8. Verify that the PEM circuit breakers are in the ON position.
9. Break the tagout or lockout seals on the branch circuit or power distribution unit.
10.Apply power by closing the branch circuit or power distribution unit.
The OOS indicator LED will glow solid red and the other LEDs will go dark. The OOS
will not go dark and the IS indicator LED will not illuminate until the external power
circuit breakers are closed.
11.Verify that all FRU LEDs illuminate and the PEM’s IS LED is green, and the OOS LED
is dark.
5.10 Powering Up the System
With the installation cabled up, you are ready to apply power to the system.
Procedure
Follow these steps to power up the system:
1. Push the PEM circuit breakers to the ON position.
2. Verify that all FRU LEDs illuminate and the PEM’s In Service LED is green.
The system executes its normal start-up routine and is then ready to use.
Cover all open module slots and put all approved filler panels in place before turning on
power. This is necessary to properly cool the chassis and to avoid electrical shock and other
possible hazards. Slot covers and panels must remain in place during system operation.
Summary of Contents for AXP640-AC2-110VAC
Page 8: ...AXP640 Installation and Use 6806800M24E Contents 8 Contents Contents ...
Page 10: ...AXP640 Installation and Use 6806800M24E 10 List of Tables ...
Page 26: ...Platform Architecture AXP640 Installation and Use 6806800M24E 26 ...
Page 46: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 46 Figure 2 14 AC Inlet 220V ...
Page 52: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 52 ...
Page 76: ...Site Preparation AXP640 Installation and Use 6806800M24E 76 ...
Page 86: ...AXP640 Operations AXP640 Installation and Use 6806800M24E 86 ...
Page 110: ...AXP640 Shelf Installation AXP640 Installation and Use 6806800M24E 110 ...
Page 138: ...FRU Installation AXP640 Installation and Use 6806800M24E 138 ...
Page 189: ......