FRU Installation
AXP640 Installation and Use (6806800M24E)
121
5. Fully insert the blade and lock it to the shelf by squeezing the lever and the latch
together and turning the handles towards the face plate.
If your shelf is powered, as soon as the blade is connected to the backplane power
pins, the blue LED is illuminated.
When the blade is completely installed, the blue LED starts to blink. This indicates
that the blade announces its presence to the shelf management controller.
6. Wait until the blue LED is switched off, then tighten the face plate screws which
secure the blade to the shelf.
If an RTM is connected to the front blade, make sure that the handles of both the RTM and the
front blade are closed in order to power up the blade`s payload.
Summary of Contents for AXP640-AC2-110VAC
Page 8: ...AXP640 Installation and Use 6806800M24E Contents 8 Contents Contents ...
Page 10: ...AXP640 Installation and Use 6806800M24E 10 List of Tables ...
Page 26: ...Platform Architecture AXP640 Installation and Use 6806800M24E 26 ...
Page 46: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 46 Figure 2 14 AC Inlet 220V ...
Page 52: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 52 ...
Page 76: ...Site Preparation AXP640 Installation and Use 6806800M24E 76 ...
Page 86: ...AXP640 Operations AXP640 Installation and Use 6806800M24E 86 ...
Page 110: ...AXP640 Shelf Installation AXP640 Installation and Use 6806800M24E 110 ...
Page 138: ...FRU Installation AXP640 Installation and Use 6806800M24E 138 ...
Page 189: ......