14
Installation and start-up
Weather Station Suntracer KNX sl
• Status: 14.07.2016 • Errors excepted. Subject to technical changes.
2.4.4. Closing the installation
2.5. Instructions for assembly and initial start-up
Remove all transport protection stickers present after installation.
The wind measurement value and thus also all wind switching outputs cannot be out-
put until 35 seconds after the power is turned on.
Fig. 14
Connect
KNX data (+|-) and
power supply (12…40V DC, 12…28V AC, 1|2)
to the connector.
The terminal assignment of the power supply
is polarity-independent.
-
+
1
2
-
+
1
2
KNX
Voltage
Fig. 15
Push the lid on the lower part. This also
makes the plug-in connection between the
board in the lid and the socket in the lower
part.
Fig. 16
Screw the lid (top) and lower part (bottom) to-
gether.