Elnec s. r. o.
132
start time of executing the Job (it means time when Load project operation was
performed)
end time of executing the Job (time of creating the Job Report)
device name
device type
checksum
device operation options
serialization information
statistics information
Job Report is generated in following cases:
user command Load project is selected
closing or disconnecting programmer sites is selected
closing the PG4UW MC
device Count down counter reaches 0 (finished status)
manually by user, when menu "File | Job Report" is used
The Job Report is generated for recently loaded project file, only when statistics value of
Total is greater than 0.
It means, at least one device operation (program, verify,...) must be performed.
Job Report dialog settings are in dialog PG4UWMC Settings (menu Options / Settings) in tab
Job Report.
Following options are available for Job Report:
When the checkbox Automatically save Job Report file is checked, the Job Report will be
saved automatically to directory specified in edit field Job Report directory and with file name
created as following:
job_report_<ordnum>_<prjname>.jrp
where
<ordnum>
is decimal order of the file. If there are any report files with the same name, then
order for new report file is incremented about order of existing files.
Summary of Contents for BeeHive304
Page 6: ...Elnec s r o 6 Introduction ...
Page 10: ...Elnec s r o 10 Quick Start ...
Page 13: ...Detailed description 13 Detailed description ...
Page 14: ...Elnec s r o 14 BeeHive304 ...
Page 29: ...BeeProg3 29 BeeProg3 ...
Page 43: ...Setup 43 Setup ...
Page 58: ...Elnec s r o 58 PG4UW software ...
Page 125: ...PG4UWMC software 125 PG4UWMC software ...
Page 138: ...Elnec s r o 138 Installation procedure customized ...
Page 143: ...Common notes 143 Common notes ...
Page 148: ...Elnec s r o 148 Troubleshooting and warranty ...
Page 152: ...Elnec s r o Jana Bottu 5 SK 080 01 Presov Slovakia www elnec com ZLI 0330 ...