Doc
#
E145701
TOC-2
Table of Contents
Electro
Industries/GaugeTech
™
Powered by Innovation™
3.4: Shark® 100T Transducer Installation
4.1: Considerations When Installing Meters
4.2: CT Leads Terminated to Meter
4.3: CT Leads Pass Through (No Meter Termination)
4.4: Quick Connect Crimp-on Terminations
4.5: Voltage and Power Supply Connections
4.8: Electrical Connection Diagrams
4.9: Extended Surge Protection for Substation Instrumentation 4-21
5.1: Shark® 100/50 Meter Serial Based Communication
5.1.2: RS485/KYZ Output Com 2 (485P Option)