![Electro Industries/GaugeTech Shark 100B Installation And Operation Manual Download Page 56](http://html.mh-extra.com/html/electro-industries-gaugetech/shark-100b/shark-100b_installation-and-operation-manual_2379723056.webp)
Doc
#
E145701
3-4
3: Mechanical Installation
Electro
Industries/GaugeTech
™
Powered by Innovation™
3.2: ANSI Installation Steps
INSTALLATION STEPS:
1. Slide meter with Mounting Gasket
into panel.
2. Secure from back of panel with flat
washer, lock washer and nut on each
threaded rod. Use a small wrench to
tighten. Do not overtighten: the
maximum installation torque is
0.4 Newton-Meter.
Lock washer
and nut
Threaded Rods
NEMA 12 Mounting
Gasket
Figure 3.7: ANSI Installation