![Electro Industries/GaugeTech Shark 100B Installation And Operation Manual Download Page 117](http://html.mh-extra.com/html/electro-industries-gaugetech/shark-100b/shark-100b_installation-and-operation-manual_2379723117.webp)
Doc
#
E145701
6-21
6: Using the Shark® 100 Meter
Electro
Industries/GaugeTech
™
Powered by Innovation™
6.5.2: Connecting to the Transducer/Meter through
CommunicatorPQA®
Software
How to Connect:
1. Open CommunicatorPQA® software.
2. From the Main screen, click the Connect icon in the Icon bar.
3. The Connect screen opens. If you are connecting via RS485, make sure your set-
tings are the same as shown here. Use the pull-down menus to make any neces-
sary changes to the settings.
a. If you are connecting with either a Shark® 100 - INP10 meter/transducer, a
Shark® 100B/100BT meter, or a Shark® 50B meter, click the Network radio
button. Your screen changes to the Connect screen shown on the next page.
Click the Connect Icon