Doc
#
E145701
4-17
4: Electrical Installation
Electro
Industries/GaugeTech
™
Powered by Innovation™
7. Service: Delta, 3-Wire with 2 PTs, 3 CTs
Select: “2 CT DEL” (2 CT Delta) from the Shark® meter’s Front Panel Display. (See
Chapter 6.)
NOTE:
The third CT for hookup is optional, and is used only for current
measurement.
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
2 x 0.1A
FUSE
3A
C
C
B
B
A
A
Not connected to meter
C
B
A
C
B
A