ELBUR: PB 521 II, PB 526 II
Elbur sp. z o.o. sp.k.
20 of 36
6.8. Cable routing
Warning
Pay special attention to securely placing all cables and wirings. Make sure
they will not be stretched, driven over or damaged by moving parts.
The power cable holder is located on the mattress
support platform on the foot section and head section.
The power supply cord has to be secured in the power
cable holder, otherwise it might be damaged by
stretching, running over or squeezing.
There are holders for hand switch cable on both
sides of the mattress support platform (in the non-
moving section). Please use one on the side, where
hand switch is going to be hooked.
6.9. Testing of adjustment functions
Warnings
During the performing tests of adjustment functions, ensure that the
cables and wires cannot be damaged or overstretched.
The nursing bed should be plugged-in to the separate socket during
the tests.
There must be enough space for bed height adjustment. It cannot be
blocked by any obstacles (bedside lockers or windowsills).
Plug-in the mains cable plug and start checking all adjustment functions.
There should be no strange noises from drive units and adjustment should
go seamlessly. Leave the nursing bed in its highest position after performing
all tests. Remember to remove the mains plug from the socket. After that
you can finish assembling the nursing bed.
6.10. Assembly of the end boards
(does not apply for PB 521 II)
•
attach two bevels to each end board using screws,
•
push bevels (attached with end boards) into tubes
of the mattress support platform to the limit,
•
secure end boards and mattress support platform
connection by screwing in and tightening the knurled
screws.