
®
A NORDSON COMPANY
Ultra TT User's Guide
Version 1.2
2.5.3
MULTI AIR INPUT VALVE
EFD's multi-air input valves include 780S-SS.
Install the corresponding valve mounting fixture to the selected valve and then
install the mounting fixture onto the Z-carriage. Refer to Section 8
(Accessories) for the entire list of EFD valve mounting fixtures.
23
The pulsed air for valve operation
plugs into the P1 connector on
the Z-head. Set the air pressure
on P1 Gauge/Regulator to 70 psi.
The pulsed nozzle air plugs into
the P2 connector on the Z-head.
Ensure the air pressure for P2
Gauge/Regulator is set to desired
atomizing pressure.
The fluid reservoir supply air
quick-connect plugs into Aux Air
channel located on top of the Z-
head.