6-15
6.3
General Cleaning and Inspection
Whenever the Unit has been recovered from a deployment, the Unit should be cleaned and rinsed with
fresh water to avoid salt buildup and deterioration of mechanical parts. A visual check of the Housing and
release mechanism should be performed to detect any signs of damage, excessive wear, corrosion, etc.
6.3.1
Inspection Particulars
•
Check the condition of the threaded release shaft, particularly the area of contact with the
Release Link.
•
Check for wear, corrosion or distortion of the Top Pad Eye (lifting eye).
•
Check for corrosion of the purge plug.
•
Check and replace if needed all O-rings.
o
Each End Cap has two O-rings: a rounded O-ring and a flat, back-up O-ring. The inner O-
ring is the flat backup O-ring, the curved surface should be facing the outer round O-ring
and toward the endcap. Both O-rings need to in the correct position and properly
lubricated to ensure water tight integrity.
Figure 6-23
:
Cross Section of Round and Back-up O-rings
•
Check and replace if needed the two Anodes.
•
Check the Housing for signs of corrosion or damage to the hard coat.
o
If there is damage to the paint and or Hard Coat on the outside of the Release, use an
epoxy based paint to seal the surface
Summary of Contents for PORT LF
Page 9: ...ix 6 Fax one invoice packing list and a copy of the airway bill to EdgeTech upon shipment...
Page 18: ......
Page 20: ......
Page 25: ...2 5 Figure 2 2 PORT LF Mechanical Standard 0010815...
Page 26: ...SECTION 2 SPECIFICATIONS 2 6 Figure 2 3 PORT LF DEEP Mechanical 0019564...
Page 46: ......
Page 48: ......
Page 65: ...6 17 Figure 6 24 PORT LF Callout Assembly Drawing Page 1 of 2 0008118...
Page 66: ...MAINTENANCE 6 18 Figure 6 25 PORT LF Callout Assembly Drawing Page 2 of 2 0008118...
Page 69: ......
Page 70: ...REMOTE RELEASE B 2 Appendix Figure B 1 Remote Release 0012120...
Page 71: ...B 3 Appendix Figure B 2 PORT LF Optional Remote Release 0012266...
Page 72: ...B 4 Appendix Figure B 3 PORT LF Optional Remote Release Callout 0007639...
Page 74: ...C 2 Appendix Figure C 1 Optional Tandem Kit Diagram 0017625...
Page 75: ...C 3 Appendix Figure C 2 PORT LF Optional Tandem Kit Callout Diagram 0008237...
Page 76: ......
Page 78: ...D 2 Appendix Figure D 1 PORT LF Optional Strongback Diagram 0017674...
Page 79: ...D 3 Appendix Figure D 2 PORT LF Optional Strongback Kit Callout Diagram 0008166...