SECTION 4:
OPERATING INSTRUCTIONS
4-10
PORT LF
0008595_REV_E
5.
While holding the Release End Cap in place insert the Kynar retaining rod back into the slot.
Continue inserting the rod until it comes out the other end of the slot as shown in
and
Figure 4-15: Replacing the Kynar Retention Rod
Figure 4-16: The Fully Inserted Kynar Retention Rod
Summary of Contents for PORT LF
Page 9: ...ix 6 Fax one invoice packing list and a copy of the airway bill to EdgeTech upon shipment...
Page 18: ......
Page 20: ......
Page 25: ...2 5 Figure 2 2 PORT LF Mechanical Standard 0010815...
Page 26: ...SECTION 2 SPECIFICATIONS 2 6 Figure 2 3 PORT LF DEEP Mechanical 0019564...
Page 46: ......
Page 48: ......
Page 65: ...6 17 Figure 6 24 PORT LF Callout Assembly Drawing Page 1 of 2 0008118...
Page 66: ...MAINTENANCE 6 18 Figure 6 25 PORT LF Callout Assembly Drawing Page 2 of 2 0008118...
Page 69: ......
Page 70: ...REMOTE RELEASE B 2 Appendix Figure B 1 Remote Release 0012120...
Page 71: ...B 3 Appendix Figure B 2 PORT LF Optional Remote Release 0012266...
Page 72: ...B 4 Appendix Figure B 3 PORT LF Optional Remote Release Callout 0007639...
Page 74: ...C 2 Appendix Figure C 1 Optional Tandem Kit Diagram 0017625...
Page 75: ...C 3 Appendix Figure C 2 PORT LF Optional Tandem Kit Callout Diagram 0008237...
Page 76: ......
Page 78: ...D 2 Appendix Figure D 1 PORT LF Optional Strongback Diagram 0017674...
Page 79: ...D 3 Appendix Figure D 2 PORT LF Optional Strongback Kit Callout Diagram 0008166...