4-11
4.1.5
Replacing the Purge Port Plug
1.
Purge the instrument as per the following sub-section
2.
Replace the Purge Port Plug as shown in
Figure 4-17: Replace the Purge Port Plug
3.
Replace the Anti-Rotation Block using the two nylon screws as shown in
. The
completed assembly is shown in
E
RROR
!
R
EFERENCE SOURCE NOT FOUND
.
.
Figure 4-18: Replace the Anti-Rotation Block using the Two Nylon Screw
4.
At this point it is good practice to perform an air acoustic test of the system by running through
the command set for the PORT-LF (See section
Inserted Purge Port
Summary of Contents for PORT LF
Page 9: ...ix 6 Fax one invoice packing list and a copy of the airway bill to EdgeTech upon shipment...
Page 18: ......
Page 20: ......
Page 25: ...2 5 Figure 2 2 PORT LF Mechanical Standard 0010815...
Page 26: ...SECTION 2 SPECIFICATIONS 2 6 Figure 2 3 PORT LF DEEP Mechanical 0019564...
Page 46: ......
Page 48: ......
Page 65: ...6 17 Figure 6 24 PORT LF Callout Assembly Drawing Page 1 of 2 0008118...
Page 66: ...MAINTENANCE 6 18 Figure 6 25 PORT LF Callout Assembly Drawing Page 2 of 2 0008118...
Page 69: ......
Page 70: ...REMOTE RELEASE B 2 Appendix Figure B 1 Remote Release 0012120...
Page 71: ...B 3 Appendix Figure B 2 PORT LF Optional Remote Release 0012266...
Page 72: ...B 4 Appendix Figure B 3 PORT LF Optional Remote Release Callout 0007639...
Page 74: ...C 2 Appendix Figure C 1 Optional Tandem Kit Diagram 0017625...
Page 75: ...C 3 Appendix Figure C 2 PORT LF Optional Tandem Kit Callout Diagram 0008237...
Page 76: ......
Page 78: ...D 2 Appendix Figure D 1 PORT LF Optional Strongback Diagram 0017674...
Page 79: ...D 3 Appendix Figure D 2 PORT LF Optional Strongback Kit Callout Diagram 0008166...