SECTION 6:
MAINTENANCE
6-16
PORT LF
0008595_REV_E
6.3.2
General Inspection and Replacement Schedule
This chart is for customer convenience and gives general guidelines for inspection and suspected
replacement times for key parts. Regular inspections and cleaning are vital and should be done in tandem.
Table 6-1: General Inspection and Replacement Schedule
6.4
Common Spares
Common spares for the PORT-LF Unit are listed below along with their EdgeTech part numbers:
QTY
DESCRIPTION
EDGETECH MTL NUMBER
2
Screw, 10-32 x 1”, PH, Nylon
MTL 34
1
Block, anti-rotation
MTL 33
2
Anode, activated aluminum, 1” diameter ¼ - 20
MTL 29
1
Release Link
MTL 32
1
Battery, Alkaline, PORT-LF
MTL 45
2
O-ring, 2-240, N70
MTL 44
2
Back-up ring, 8-240, N90
MTL 43
1
O-ring, 10 x 14 x 2 mm, N70
MTL 18
2
O-ring, 2-008, N70
MTL 31
2
Closure strip, Kynar
MTL 57
1
Assembly, purge port
MTL 30
Table 6-2: Common Spares Refer to 0008118
6.5
Callout Assembly Drawings
Part Callout Assembly drawings for the PORT-LF are on the following pages:
PART
SERVICE / INSPECTION
REPLACEMENT
NOTES
O-ring
Before and After Each
Deployment
As needed
Any questionable O-ring should be immediately replaced.
EdgeTech recommends the use of
Parker’s Super O-lube
silicone compound grease.
Battery Pack
Before Each Deployment As needed
Release Link
Before and After Each
Deployment
Per release
Sacrificial part; can be recovered with assembly when using
tandem kit.
Release Shaft
O-Ring
As needed
Check after 3-5 years Contact
for replacement
Anodes (2)
After Each Deployment
As needed
Anti-Rotation
Block
Before and After Each
Deployment
Should not be
needed
Summary of Contents for PORT LF
Page 9: ...ix 6 Fax one invoice packing list and a copy of the airway bill to EdgeTech upon shipment...
Page 18: ......
Page 20: ......
Page 25: ...2 5 Figure 2 2 PORT LF Mechanical Standard 0010815...
Page 26: ...SECTION 2 SPECIFICATIONS 2 6 Figure 2 3 PORT LF DEEP Mechanical 0019564...
Page 46: ......
Page 48: ......
Page 65: ...6 17 Figure 6 24 PORT LF Callout Assembly Drawing Page 1 of 2 0008118...
Page 66: ...MAINTENANCE 6 18 Figure 6 25 PORT LF Callout Assembly Drawing Page 2 of 2 0008118...
Page 69: ......
Page 70: ...REMOTE RELEASE B 2 Appendix Figure B 1 Remote Release 0012120...
Page 71: ...B 3 Appendix Figure B 2 PORT LF Optional Remote Release 0012266...
Page 72: ...B 4 Appendix Figure B 3 PORT LF Optional Remote Release Callout 0007639...
Page 74: ...C 2 Appendix Figure C 1 Optional Tandem Kit Diagram 0017625...
Page 75: ...C 3 Appendix Figure C 2 PORT LF Optional Tandem Kit Callout Diagram 0008237...
Page 76: ......
Page 78: ...D 2 Appendix Figure D 1 PORT LF Optional Strongback Diagram 0017674...
Page 79: ...D 3 Appendix Figure D 2 PORT LF Optional Strongback Kit Callout Diagram 0008166...