9.2.4
Replacing the pump head and diaphragm
Fig. 22: Replacing the pump head and diaphragm
1
Cover plate
2
Metering head screws (4 off)
3
Pump head
4
Diaphragm
5
Support disk (not at 2.5 l/h)
6
Intermediate plate
7
Bellows
1.
Remove the cover plate (pos. 1) on the metering head
2.
Loosen the metering head screws (pos. 2).
3.
Remove the pump head (pos. 3).
4.
Unscrew the diaphragm (pos. 4), intermediate plate (pos. 6)
and support disk (pos. 5).
5.
Remove the bellows (pos. 7) from the plunger.
6.
Install the new bellows in the correct position, pos. 7.
7.
Place in the intermediate plate in the correct position, pos. 6.
8.
Slide the support disk in the correct position (concave side facing the diaphragm)
over the thread of the diaphragm.
9.
Install new diaphragms and support disk.
CAUTION!
Only tighten diaphragms by hand and do not use a tool!
10.
Turn the intermediate plate clockwise until the diaphragm rupture drain faces down.
11.
Mount the pump head and pay attention to the direction of flow, pos. 3.
12.
Hand-tighten the pump head screws and then tighten them cross-wise.
CAUTION!
Tightening torque for metering head screws = 3 - 4 Nm.
Check the torque after 24 hours!
13.
Mount the cover plate on the pump head.
Maintenance
47
417101964 Rev. 4-04.2019
Summary of Contents for 141277
Page 2: ......
Page 137: ...67 417101964 Rev 4 04 2019...