Bringing the pellet boiler into the central heating room
This section describes the prerequisites as well as the working sequence required.
1
.
Transport
2
.
Notes on bringing the unit into the building
3
.
Casing parts
4
.
Dismantling the casing parts
7.1
Transport
Maine Energy Systems supplies the pellet boiler on a pallet. The pellet boiler is ready
to be connected.
The control unit for the boiler controller is integrated into the control panel.
If it is not possible to bring the boiler into the building at ground level, remove the
casing, the burner, the boiler controller and the pellet hopper. This will reduce the
weight of the unit and make it easier to carry.
Tighten the hydraulic connections firmly on site and carry out a density test.
NOTICE
Contamination and corrosion
Make sure that the pellet boiler is located under a roof if it needs to be stored outside
before it is transported/ brought into the building.
7.2
Notes on bringing the unit into the building
Make sure that the pellet boiler is located under a roof if it needs to be stored outside
before it is transported/brought into the building.
Minimum door width — max. unit dimension
Easypell 16 / 20
16 – 20 kW
677 mm
Easypell 25 / 32
25 – 32 kW
724 mm
7 Bringing the pellet boiler into the central heating room
17
Installation Manual
Summary of Contents for Easypell
Page 1: ...Installation Manual Easypell 16 32 kW ENGLISH www easypell com 200014EN...
Page 6: ...6 2 Intended use Installation Manual...
Page 34: ...34 10 Fuses boiler controller Installation Manual...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......