MAINTENANCE
Only perform maintenance work on the XRGI
®
system when it is not in
operation and is fully cooled down! Otherwise, there is a risk of burns from
hot components and/or scalding if substances should escape.
REQUIRED MATERIAL
EC POWER service kit for XRGI
®
9 (
Item No.: 01KIT2612
) consisting of:
1 pc. exhaust gas compensator
1 pc. plug for measuring point
2 pcs. hose clamps
1 pc. vacuum sensor
1 pc. injector
1 pc. vacuum filter
1 pc. lambda sensor
1 pc. gasket valve cover
1 pc. air filter
3 pcs. spark plugs
4 pcs. engine oil
1 pc. oil filter
2 pcs. zero pressure hose Ø2,0x1,5
REQUIRED TOOLS
Oil suction pump
16 mm spark plug wrench
Oil filter spanner
17 mm socket insert
Torque wrench
10 mm socket insert
Water pump pliers
3 mm Allen screwdriver
Hose clamp pliers
5 mm Allen screwdriver
Funnel
10 mm ring spanner
Feeler gauge
24 mm ring spanner
FS2009USB programming device.
10 mm open-ended spanner
Flue gas analyser
17 mm open-ended spanner
Lambda sensor top long ½
19 mm open-ended spanner
10 mm socket spanner
Before commencing maintenance work, shut down the XRGI
®
system at
the user level on the iQ-Control Panel and at the main switch. Close the
gas valve and unplug the Q-Heat Distributor.
5.
MAINTENANCE XRGI
®
9
Fig. 5.01
18