![EBARA GP Operating And Maintenance Manual Download Page 37](http://html1.mh-extra.com/html/ebara/gp/gp_operating-and-maintenance-manual_3846466037.webp)
13
ENGLISH
D
– HYDRAULIC CONNECTIONS
1-Group with threaded connections
a-Intake line
d-
G 1/2 ” air intake for fixed speed boosters
(optional for flanged pump suction line)
2-Group with flanged connections
b-Delivery line
3-Group with 1 pump
c-G1 pipe section
E
– PRIMING
F
– STARTING THE SYSTEM
g-Filling cap
h-Delivery isolating valves
i- Intake isolating valves
h-Delivery isolating valves
i-Intake isolating valves
m-Electrical panel or protection panel
Summary of Contents for GP
Page 2: ......