![Eaton Green Motion DC 44/66 Installation Manual Download Page 16](http://html1.mh-extra.com/html/eaton/green-motion-dc-44-66/green-motion-dc-44-66_installation-manual_3692091016.webp)
12
GREEN MOTION DC 44/66 EV CHARGER INSTALLATION MANUAL
MN192006EN March 2023 www.eaton.com
00 Title
Figure 5 shows the front and side views of the EV charger with dimensions.
Figure 5. Green Motion DC 44/66 EV charger front and side views with dimensions
Tag
Description
A
Front view
B
Side view
4.4 Lifting, transportation and unloading instructions
Transportation and handling
Transportation of the equipment, especially on the road, must be carried out in such a way as to protect the system
components (especially electronic components) from major impacts, humidity, vibrations, etc.
During handling, sudden or fast movements which could cause the system to sway dangerously must be avoided.
Refer to local regulations and laws for transportation and handling of the equipment.
Lifting
Eaton packs and protects each component by using devices that ease its transportation and handling. These operations
must be carried out by professional and qualified personnel who specialize in loading and unloading components.
The ropes and vehicles used for lifting must be able to withstand the weight of the equipment.
630 mm (24.8 inch)
862 mm (33.9 inch)
1392 mm (54.8 inch)
1098 mm (43.2 inch)
1775 mm (69.9 inch)
105 mm (4.1 inch)
265 mm
(10.4 inch)
223 mm
(8.7 inch)
A
B