background image

1

1.0 Document overview

Green Motion BuildinG and Green Motion FleetcoMMissioninG Guide

   IL191013EN   June 2023   www.eaton.com

1.0 Document overview

For scenarios other than the ones mentioned in the “NOTICE” on the previous page, refer to 

this document for instructions on how to use Eaton’s EV charge station Commissioning Tool 

to connect Green Motion™ Building and Green Motion Fleet (EV charging station) to Eaton 

CNM software. Additionally, this document provides instructions to operate your EV charge 

station in a non-CNM (non-network) mode. The table below outlines the EV charge station 

model numbers and connectivity options.

Model number

description

connectivity to cnM

GMEV40CME1B-WC

9.6 kW AC Level 2 charger, 240 Vac, 40 A

Wi-Fi, Ethernet

GMEV40CMC1B-WC

9.6 kW AC Level 2 charger, 240 Vac, 40 A

4G, Ethernet

GMEV80CME1B-WC

19.2 kW AC Level 2 charger, 240 Vac, 80 A

Wi-Fi, Ethernet

GMEV80CMC1B-WC

19.2 kW AC Level 2 charger, 240 Vac, 80 A

4G, Ethernet

Figure 1.  Green Motion Building/Fleet (EV charge station)

The LCD screen example below shows home screen of an EV charge station  

with various icons.

Figure 2.  Green Motion Building charger (GMEV40CMC1B-WC Ethernet and cellular) 

LCD home screen

Summary of Contents for Green Motion Building

Page 1: ...Green Motion Building and Green Motion Fleet commissioning guide Eaton Green Motion...

Page 2: ...S In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence strict liability or otherwise for any special indirect incidental or consequential damage or l...

Page 3: ...A WI FI 3 3 0 EV CHARGE STATION COMMISSIONING VIA ETHERNET 5 4 0 EV CHARGE STATION COMMISSIONING VIA CELLULAR NON EATON SIM 6 5 0 EV CHARGE STATION IN NON CNM NON NETWORK MODE 8 6 0 EV CHARGE STATION...

Page 4: ...V charge station in a non CNM non network mode The table below outlines the EV charge station model numbers and connectivity options Model number Description Connectivity to CNM GMEV40CME1B WC 9 6 kW...

Page 5: ...en Motion Building charger GMEV40CME1B WC Ethernet and Wi Fi LCD home screen Figure 4 LCD icons indicating status ote N Instructions on how to install this EV charger Commissioning Tool and connect to...

Page 6: ...ton com 2 0 EV charge station commissioning via Wi Fi Model numbers GMEV40CME1B WC and GMEV80CME1B WC support Wi Fi To use Wi Fi for Eaton CNM connectivity users are required to use the Eaton EV charg...

Page 7: ...onfirm that the EV charge station received these credentials in the Activity Log Figure 6 Activity Log showing the successful transfer of Wi Fi credentials 4 Reboot the EV charge station through the C...

Page 8: ...nnection When an Ethernet RJ45 cable with valid internet connection is plugged in the EV charge station will automatically attempt to connect to the Eaton CNM LCD screen icons indicate both an Etherne...

Page 9: ...ctel EC25 AFX 4G module and support Verizon AT T and T Mobile networks Please contact your SIM card provider to confirm that the SIM card is approved to be used with these EV charge stations When an a...

Page 10: ...ge station powers up it will attempt to establish cellular connectivity with the carrier network Once successfully connected to the cellular network it will attempt to connect with the Eaton CNM Cellu...

Page 11: ...who connects their vehicle EV drivers with physical access to the EV charge station will be able to initiate a charge session 1 Connect the EV charge station to the Commissioning Tool per instructions...

Page 12: ...V charge station to the Commissioning Tool per instructions in Section 8 0 2 Go to Settings OCPP 3 Enter the OCPP server authentication key and certification details Please contact your CNM software p...

Page 13: ...charge station 1 Connect the EV charge station to the Commissioning Tool per instructions in Section 8 0 2 Go to Settings LCD 3 Select the desired language Click Submit 4 Reboot the EV charge station...

Page 14: ...d Green Motion Fleet under the Resources section Necessary tools Laptop or computer with Windows 8 10 11 and RJ45 Ethernet port RJ45 Ethernet cable Follow the below steps to install and use the EV cha...

Page 15: ...nnect computer with EV charge station 8 3 Update TCP IP settings on your computer ote N These instructions are also displayed in detail when you click the Set Up button on the Commissioning Tool ote N...

Page 16: ...m 3 Update the IP addresses as shown in the red box below and select OK Figure 17 IP address updates 4 You are now ready to connect the EV charge station Commissioning Tool to the EV charge station ot...

Page 17: ...sioning guide IL191013EN June 2023 www eaton com ote N If you are still unable to connect your computer to the EV charge station please check the firewall list and add eaton green motion building and...

Page 18: ...ct to the EV charge station you will need the EV charge station serial number which is found on a QR code sticker attached to the EV charge station Default password to log in is eaton It is recommende...

Page 19: ...EN June 2023 www eaton com Figure 21 EV charge station serial number 3 Users will be forced to update the default password to a stronger password Strong password requirements are mentioned under Setti...

Page 20: ...t password default password eaton by following the steps below 1 Follow the steps described in 8 1 through 8 3 to connect your computer and the EV charge station 2 Open the EV charge station Commissio...

Reviews: