11
8.0 EV charge station Commissioning Tool install and setup
Green Motion BuildinG and Green Motion FleetcoMMissioninG Guide
IL191013EN June 2023 www.eaton.com
8.0 EV charge station Commissioning Tool install and setup
Eaton’s EV charge station Commissioning Tool is available on Eaton’s product website for
Green Motion Building and Green Motion Fleet, under the
Resources
section.
Necessary tools:
•
Laptop or computer with Windows 8/10/11 and RJ45 (Ethernet) port
•
RJ45 (Ethernet) cable
Follow the below steps to install and use the EV charge station Commissioning Tool.
8.1 Install the EV charge station Commissioning Tool
Download the EV charge station Commissioning Tool on your computer and open the tool.
(Note that the setup instructions are also displayed when you click the Set Up button on the
Commissioning Tool.)
Figure 14. EV charge station Commissioning Tool setup