2
1.0 Document overview
Green Motion BuildinG and Green Motion FleetcoMMissioninG Guide
IL191013EN June 2023 www.eaton.com
Figure 3. Green Motion Building charger (GMEV40CME1B-WC Ethernet and Wi-Fi)
LCD home screen
Figure 4. LCD icons indicating status
ote:
N
Instructions on how to install this EV charger Commissioning Tool and connect to the
EV charge station are provided in Section 8.0. You will need a laptop or a computer
with Windows
®
8/10/11 and an RJ45 (Ethernet) cable.