13
8.0 EV charge station Commissioning Tool install and setup
Green Motion BuildinG and Green Motion FleetcoMMissioninG Guide
IL191013EN June 2023 www.eaton.com
3.
Update the IP addresses as shown in the red box below and select OK.
Figure 17. IP address updates
4.
You are now ready to connect the EV charge station Commissioning Tool to the
EV charge station.
ote:
N
Users may see a firewall setting pop up. Check the settings as shown and click
Allow Access.
Figure 18. Firewall setting to allow access to Commissioning Tool