EDR-5000
IM02602007E
Parameter Setting of the Under Frequency Load Shedding
The active-power of the positive phase sequence system (P1) is evaluated.
General Settings
Call up menu [Protection Para\Global Prot Para\UFLS]
Within this menu you can:
Assign signals, that activate adaptive parameters.
Assign a signal that blocks the evaluation of the active power flow direction.
Do a sign reversal on the active power. Please refer to chapter ”Trip direction of the under frequency load shedding“.
www.eaton.com
793