13
Compass sit-to-stand
Installation Manual
COMPASS SIT-TO-STAND INSTALLATION MANUAL
Eaton.com/compass
SECTION III – Assembling the desk
cont’d.
Install Cable Chain kit
•
The kit parts are designed to allow attachment to either the
left or right leg of the assembled desk� Location was pre-
determined in sections A, B & C�
•
Place outer cable channel against lift column 1" above
foot (large holes facing away from column)� Slide cable
chain strap around column and thru large opening in
outer channel - slide stud slot over threaded stud in outer
channel� Thread (1) ¼-20 acorn nut (I) to stud capturing
strap� Do not tighten� Locate tab slot in strap, place over
outer channel tab� To retain tab in slot, assemble inner
channel section over tab, attach using (2) ¼-20 acorn
nuts (I)� Do not tighten�
•
Side outer channel down to top of foot – aligning tab in
outer channel and slot in foot� Pull cable chain strap and
tighten all acorn nuts using
3
⁄
8
hex socket with extension�
•
Ensure that rubber flap is in place on cable channel inner
section� Tuck rubber flap inside channel
•
Attach work surface bracket to pre-drilled holes using
(2) #10 x 1" Phillips pan head screws (A).
•
Mount cable chain to cable channel using (2) # ¼-20 x
3
⁄
8
button head screws (G), (2) #¼-20 acorn nuts (I).
COMPLETED
ASSEMBLY
Foot
Large hole
in channel
Cable channel
outer section
Cable
chain
#10 x 1"
screws
1
⁄
4
-20 Button
head screws
1
⁄
4
"-20
Acorn Nut
Worksurface
bracket
Tab on
channel
Worksurface
bracket
Cable
chain
strap
Tab slot
Stud slot
Cable channel
inner section
Rubber flap