![Eaton APS6-400 Series Installation And Operation Manual Download Page 24](http://html1.mh-extra.com/html/eaton/aps6-400-series/aps6-400-series_installation-and-operation-manual_3770729024.webp)
Access Power Solutions Installation Guide (APS6-400 Series)
16
Copyright © 2009-2010 Eaton Corporation. All Rights Reserved.
IPN 997-00012-53B December 2010
Rectifier internal fuses
(IEC 60127-2) Time-
Current Curve
(minimum and
maximum)
Sources:
Schurter SP 5x20 Pigtail
data sheet.
Step 5 - Check the grounding arrangements at the site
Confirm that all grounds are brought together at one "star" point so that surge
currents cannot flow in "ground loops" and create large voltages.
Procedure complete
Task 2 - Customize APS
Step 1 - Change mounting brackets if required
APSs are pre-assembled with 19-inch rack-mounting brackets.
If required, the brackets can be moved for relay-rack mounting and/or replaced with
brackets for use in 23-inch wide racks (supplied):
1
Undo the screws holding each bracket.
2
Relocate to the alternate position or attach the replacement brackets. Tighten the
screws.