Installation
Eaton
®
Power Xpert
®
9395C UPS Installation and Operation Manual P-164000821—Rev 01
www.eaton.com/powerquality
4-19
4.
Locate the external wiring terminal hardware kit packed on the bottom left side of the ISBM section.
5.
Using hardware from the external wiring terminal hardware kit (see Table 3-8), connect phase A, B, and C
rectifier input power wiring from the utility source to the rectifier input terminals in the ISBM section. See
paragraph 3.2.3 for wiring and termination requirements.
6.
Using hardware from the external wiring terminal hardware kit (see Table 3-8), connect phase A, B, and C
wiring from the output terminals of each UPS unit to the customer-supplied tie cabinet or load distribution
panel. See paragraph 3.2.3 for wiring and termination requirements.
7.
8.
Using hardware from the external wiring terminal hardware kit (see Table 3-8), connect phase A, B, and C
power wiring from output terminals to the critical load. See paragraph 3.2.3 for wiring and termination
requirements.
9.
Summary of Contents for 9395C-1000/1000
Page 2: ......
Page 23: ...Section I Installation ...
Page 24: ......
Page 93: ...Section II Operation ...
Page 94: ......
Page 155: ......
Page 156: ... P 164000821 1 P 164000821 1 ...