UPS Maintenance
Eaton
®
Power Xpert
®
9395C UPS Installation and Operation Manual P-164000821—Rev 01
www.eaton.com/powerquality
9-3
a.
Remove one top screw and two bottom screws securing each PM section front panel (see
Figure 4-3). Lift the panel straight up to remove it from the panel hanger bracket at the top of the
cabinet.
b.
Remove one top screw and two bottom screws securing each ISBM section front panel (see
Figure 4-2). Lift the panel straight up to remove it from the panel hanger bracket at the top of the
cabinet.
c.
If the UPS is a continuous static switch configuration, unfasten the front door latch and swing the
door open (see Figure 4-1).
d.
Pull the foam filters over the screw heads on the cabinet mounted studs and remove the filters from
the cabinet.
e.
Push the washed or new foam filters over the screw heads on the cabinet mounted studs until
seated against the cabinet.
f.
Reinstall the PM section front panels removed in Step a. and secure with the retained hardware.
g.
Reinstall the ISBM section front panel removed in Step b. and secure with the retained hardware.
h.
If opened, close the front door and secure the latch.
Summary of Contents for 9395C-1000/1000
Page 2: ......
Page 23: ...Section I Installation ...
Page 24: ......
Page 93: ...Section II Operation ...
Page 94: ......
Page 155: ......
Page 156: ... P 164000821 1 P 164000821 1 ...