
MAINTENANCE, SERVICE AND FAULT FINDING
4-4
25364 Issue 8 March 2018
Maintenance Schedule
The Compact 32d, 32c, 53c and Communicator II do not require
component replacement as part of a preventative maintenance routine. We
recommend regular checks to ensure optimum performance is maintained
and to allow any parts requiring future replacement to be identified early.
Maintenance Schedule
Frequency
Recommended Actions
Regularly
(or if print quality
deteriorates)
Check condition and clean Print Head and
Rubber capstan roller each time the ribbon is
replaced (or at least once per day).
Check condition of the rubber platen / rubber
roller within the printer bracket. the rubber
surface must be smooth, flat and free of debris.
This should be a weekly check.
As part of any fault finding routine, check that
settings such as ‘Contrast’ and ‘Print Head
Pressure’ have not been modified in away from
the original values. Once set, these settings do
not generally need to be changed. Any changes
may have been made to compensate for other
problems. For example, the contrast or pressure
settings may have been set higher to compensate
for a print head that needs cleaning.
Every Year
Check condition of the Ribbon guide rollers
(including those on the dancing arms). Check that
the plastic rollers rotate smoothly.
Summary of Contents for Compact 32D
Page 1: ...Compact 32d Compact 32C Compact 53c Communicator II Easyprint Product Manual...
Page 2: ...2 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 7: ...25364 Issue 8 March 2018 7 EC DECLARATION OF CONFORMITY...
Page 9: ...25364 Issue 8 March 2018 9 EC DECLARATION OF CONFORMITY...
Page 14: ...HEALTH AND SAFETY 1 2 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...DESCRIPTION AND INSTALLATION 2 4 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 87: ...DESCRIPTION AND INSTALLATION 25364 Issue 8 March 2018 2 67...
Page 88: ...DESCRIPTION AND INSTALLATION 2 68 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 92: ...OPERATION 3 4 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 136: ...OPERATION 3 48 25364 Issue 8 March 2018 Line Movement IM Static...
Page 149: ...OPERATION 25364 Issue 8 March 2018 3 61...
Page 150: ...OPERATION 3 62 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 228: ...TECHNICAL REFERENCE 5 2 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 236: ...TECHNICAL REFERENCE 5 10 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 237: ...25364 Issue 8 March 2018 6 1 PART 6 GLOSSARY OF TERMS CONTENTS Page GLOSSARY OF TERMS 6 3...
Page 238: ...GLOSSARY OF TERMS 6 2 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 242: ...GLOSSARY OF TERMS 6 6 25364 Issue 8 March 2018 THIS PAGE INTENTIONALLY LEFT BLANK...